Browse 1,193 controls and enhancements across 20 security and privacy families. Use the GovRAMP crosswalk to locate controls referenced by Security Snapshot, Core, and Moderate.
A shared catalog supports common-control planning; designation as a common, hybrid, or system-specific control depends on your organization’s implementation and inheritance decisions.
Sources and crosswalk scope
NIST OSCAL content 5.1.1+u4, retrieved 2026-09-18. GovRAMP Snapshot v1.4 and Core selection from Moderate v1.06 reference the December 2020 Rev. 5 text. Mappings establish exact identifier correspondence, not identical requirements, inherited implementation, or GovRAMP authorization. GovRAMP parameters and additional requirements remain authoritative for each program. Full Moderate, High, and other programs are not mapped here. Withdrawn controls are retained for reference.
Provide for the recovery and reconstitution of the system to a known state within [Assignment: organization-defined time period consistent with recovery time and recovery point objectives] after a disruption, compromise, or failure.
Discussion
Recovery is executing contingency plan activities to restore organizational mission and business functions. Reconstitution takes place following recovery and includes activities for returning systems to fully operational states. Recovery and reconstitution operations reflect mission and business priorities; recovery point, recovery time, and reconstitution objectives; and organizational metrics consistent with contingency plan requirements. Reconstitution includes the deactivation of interim system capabilities that may have been needed during recovery operations. Reconstitution also includes assessments of fully restored system capabilities, reestablishment of continuous monitoring activities, system reauthorization (if required), and activities to prepare the system and organization for future disruptions, breaches, compromises, or failures. Recovery and reconstitution capabilities can include automated mechanisms and manual procedures. Organizations establish recovery time and recovery point objectives as part of contingency planning.
GovRAMP crosswalk
GovRAMP Core Readiness — 60 Controls · CP-10 — Direct NIST identifier reference. GovRAMP source matrix
GovRAMP Moderate Readiness · CP-10 — Direct NIST identifier reference. GovRAMP source matrix
Implement transaction recovery for systems that are transaction-based.
Discussion
Transaction-based systems include database management systems and transaction processing systems. Mechanisms supporting transaction recovery include transaction rollback and transaction journaling.
GovRAMP crosswalk
GovRAMP Moderate Readiness · CP-10 (2) — Direct NIST identifier reference. GovRAMP source matrix
Provide the capability to restore system components within [Assignment: restoration time periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components.
Discussion
Restoration of system components includes reimaging, which restores the components to known, operational states.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.
Protect system components used for recovery and reconstitution.
Discussion
Protection of system recovery and reconstitution components (i.e., hardware, firmware, and software) includes physical and technical controls. Backup and restoration components used for recovery and reconstitution include router tables, compilers, and other system software.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.