NIST OSCAL content 5.1.1+u4, retrieved 2026-09-18. GovRAMP Snapshot v1.4 and Core selection from Moderate v1.06 reference the December 2020 Rev. 5 text. Mappings establish exact identifier correspondence, not identical requirements, inherited implementation, or GovRAMP authorization. GovRAMP parameters and additional requirements remain authoritative for each program. Full Moderate, High, and other programs are not mapped here. Withdrawn controls are retained for reference.
a. Test the contingency plan for the system [Assignment: frequency] using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: [Assignment: organization-defined tests].
b. Review the contingency plan test results; and
c. Initiate corrective actions, if needed.
Discussion
Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.
GovRAMP crosswalk
GovRAMP Moderate Readiness · CP-4 — Direct NIST identifier reference. GovRAMP source matrix
Coordinate contingency plan testing with organizational elements responsible for related plans.
Discussion
Plans related to contingency planning for organizational systems include Business Continuity Plans, Disaster Recovery Plans, Continuity of Operations Plans, Crisis Communications Plans, Critical Infrastructure Plans, Cyber Incident Response Plans, and Occupant Emergency Plans. Coordination of contingency plan testing does not require organizations to create organizational elements to handle related plans or to align such elements with specific plans. However, it does require that if such organizational elements are responsible for related plans, organizations coordinate with those elements.
GovRAMP crosswalk
GovRAMP Moderate Readiness · CP-4 (1) — Direct NIST identifier reference. GovRAMP source matrix
Test the contingency plan at the alternate processing site:
(a) To familiarize contingency personnel with the facility and available resources; and
(b) To evaluate the capabilities of the alternate processing site to support contingency operations.
Discussion
Conditions at the alternate processing site may be significantly different than the conditions at the primary site. Having the opportunity to visit the alternate site and experience the actual capabilities available at the site can provide valuable information on potential vulnerabilities that could affect essential organizational mission and business functions. The on-site visit can also provide an opportunity to refine the contingency plan to address the vulnerabilities discovered during testing.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.
Test the contingency plan using [Assignment: automated mechanisms].
Discussion
Automated mechanisms facilitate thorough and effective testing of contingency plans by providing more complete coverage of contingency issues, selecting more realistic test scenarios and environments, and effectively stressing the system and supported mission and business functions.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.
Include a full recovery and reconstitution of the system to a known state as part of contingency plan testing.
Discussion
Recovery is executing contingency plan activities to restore organizational mission and business functions. Reconstitution takes place following recovery and includes activities for returning systems to fully operational states. Organizations establish a known state for systems that includes system state information for hardware, software programs, and data. Preserving system state information facilitates system restart and return to the operational mode of organizations with less disruption of mission and business processes.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.
Employ [Assignment: mechanisms] to [Assignment: system or system component] to disrupt and adversely affect the system or system component.
Discussion
Often, the best method of assessing system resilience is to disrupt the system in some manner. The mechanisms used by the organization could disrupt system functions or system services in many ways, including terminating or disabling critical system components, changing the configuration of system components, degrading critical functionality (e.g., restricting network bandwidth), or altering privileges. Automated, on-going, and simulated cyber-attacks and service disruptions can reveal unexpected functional dependencies and help the organization determine its ability to ensure resilience in the face of an actual cyber-attack.
GovRAMP crosswalk
Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.