NIST · Shared reference library

NIST SP 800-53 Rev. 5 Common Control Library

Browse 1,193 controls and enhancements across 20 security and privacy families. Use the GovRAMP crosswalk to locate controls referenced by Security Snapshot, Core, and Moderate.

A shared catalog supports common-control planning; designation as a common, hybrid, or system-specific control depends on your organization’s implementation and inheritance decisions.

Sources and crosswalk scope

NIST OSCAL content 5.1.1+u4, retrieved 2026-09-18. GovRAMP Snapshot v1.4 and Core selection from Moderate v1.06 reference the December 2020 Rev. 5 text. Mappings establish exact identifier correspondence, not identical requirements, inherited implementation, or GovRAMP authorization. GovRAMP parameters and additional requirements remain authoritative for each program. Full Moderate, High, and other programs are not mapped here. Withdrawn controls are retained for reference.

Official pinned NIST source

SHA-256: 81cf2de45ede9aef3de7ce09d65ea9d32f662c483bbf916f6e346292b22f7763

Reset

7 matching controls · Page 1 of 1

Contingency Planning · Base control

CP-8 · Telecommunications Services

Control statement and discussion

NIST control statement

Establish alternate telecommunications services, including necessary agreements to permit the resumption of [Assignment: system operations] for essential mission and business functions within [Assignment: time period] when the primary telecommunications capabilities are unavailable at either the primary or alternate processing or storage sites.

Discussion

Telecommunications services (for data and voice) for primary and alternate processing and storage sites are in scope for [CP-8](#cp-8) . Alternate telecommunications services reflect the continuity requirements in contingency plans to maintain essential mission and business functions despite the loss of primary telecommunications services. Organizations may specify different time periods for primary or alternate sites. Alternate telecommunications services include additional organizational or commercial ground-based circuits or lines, network-based approaches to telecommunications, or the use of satellites. Organizations consider factors such as availability, quality of service, and access when entering into alternate telecommunications agreements.

GovRAMP crosswalk

Contingency Planning · Enhancement

CP-8(1) · Priority of Service Provisions

View parent control
Control statement and discussion

NIST control statement

(a) Develop primary and alternate telecommunications service agreements that contain priority-of-service provisions in accordance with availability requirements (including recovery time objectives); and (b) Request Telecommunications Service Priority for all telecommunications services used for national security emergency preparedness if the primary and/or alternate telecommunications services are provided by a common carrier.

Discussion

Organizations consider the potential mission or business impact in situations where telecommunications service providers are servicing other organizations with similar priority of service provisions. Telecommunications Service Priority (TSP) is a Federal Communications Commission (FCC) program that directs telecommunications service providers (e.g., wireline and wireless phone companies) to give preferential treatment to users enrolled in the program when they need to add new lines or have their lines restored following a disruption of service, regardless of the cause. The FCC sets the rules and policies for the TSP program, and the Department of Homeland Security manages the TSP program. The TSP program is always in effect and not contingent on a major disaster or attack taking place. Federal sponsorship is required to enroll in the TSP program.

GovRAMP crosswalk

Contingency Planning · Enhancement

CP-8(2) · Single Points of Failure

View parent control
Control statement and discussion

NIST control statement

Obtain alternate telecommunications services to reduce the likelihood of sharing a single point of failure with primary telecommunications services.

Discussion

In certain circumstances, telecommunications service providers or services may share the same physical lines, which increases the vulnerability of a single failure point. It is important to have provider transparency for the actual physical transmission capability for telecommunication services.

GovRAMP crosswalk

Contingency Planning · Enhancement

CP-8(3) · Separation of Primary and Alternate Providers

View parent control
Control statement and discussion

NIST control statement

Obtain alternate telecommunications services from providers that are separated from primary service providers to reduce susceptibility to the same threats.

Discussion

Threats that affect telecommunications services are defined in organizational assessments of risk and include natural disasters, structural failures, cyber or physical attacks, and errors of omission or commission. Organizations can reduce common susceptibilities by minimizing shared infrastructure among telecommunications service providers and achieving sufficient geographic separation between services. Organizations may consider using a single service provider in situations where the service provider can provide alternate telecommunications services that meet the separation needs addressed in the risk assessment.

GovRAMP crosswalk

Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.

Contingency Planning · Enhancement

CP-8(4) · Provider Contingency Plan

View parent control
Control statement and discussion

NIST control statement

(a) Require primary and alternate telecommunications service providers to have contingency plans; (b) Review provider contingency plans to ensure that the plans meet organizational contingency requirements; and (c) Obtain evidence of contingency testing and training by providers [Assignment: organization-defined frequency].

Discussion

Reviews of provider contingency plans consider the proprietary nature of such plans. In some situations, a summary of provider contingency plans may be sufficient evidence for organizations to satisfy the review requirement. Telecommunications service providers may also participate in ongoing disaster recovery exercises in coordination with the Department of Homeland Security and state and local governments. Organizations may use these types of activities to satisfy evidentiary requirements related to service provider contingency plan reviews, testing, and training.

GovRAMP crosswalk

Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.

Contingency Planning · Enhancement

CP-8(5) · Alternate Telecommunication Service Testing

View parent control
Control statement and discussion

NIST control statement

Test alternate telecommunication services [Assignment: frequency].

Discussion

Alternate telecommunications services testing is arranged through contractual agreements with service providers. The testing may occur in parallel with normal operations to ensure that there is no degradation in organizational missions or functions.

GovRAMP crosswalk

Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.

Planning · Base control

PL-9 · Central Management

Control statement and discussion

NIST control statement

Centrally manage [Assignment: controls and related processes].

Discussion

Central management refers to organization-wide management and implementation of selected controls and processes. This includes planning, implementing, assessing, authorizing, and monitoring the organization-defined, centrally managed controls and processes. As the central management of controls is generally associated with the concept of common (inherited) controls, such management promotes and facilitates standardization of control implementations and management and the judicious use of organizational resources. Centrally managed controls and processes may also meet independence requirements for assessments in support of initial and ongoing authorizations to operate and as part of organizational continuous monitoring. Automated tools (e.g., security information and event management tools or enterprise security monitoring and management tools) can improve the accuracy, consistency, and availability of information associated with centrally managed controls and processes. Automation can also provide data aggregation and data correlation capabilities; alerting mechanisms; and dashboards to support risk-based decision-making within the organization. As part of the control selection processes, organizations determine the controls that may be suitable for central management based on resources and capabilities. It is not always possible to centrally manage every aspect of a control. In such cases, the control can be treated as a hybrid control with the control managed and implemented centrally or at the system level. The controls and control enhancements that are candidates for full or partial central management include but are not limited to: [AC-2(1)](#ac-2.1), [AC-2(2)](#ac-2.2), [AC-2(3)](#ac-2.3), [AC-2(4)](#ac-2.4), [AC-4(all)](#ac-4), [AC-17(1)](#ac-17.1), [AC-17(2)](#ac-17.2), [AC-17(3)](#ac-17.3), [AC-17(9)](#ac-17.9), [AC-18(1)](#ac-18.1), [AC-18(3)](#ac-18.3), [AC-18(4)](#ac-18.4), [AC-18(5)](#ac-18.5), [AC-19(4)](#ac-19.4), [AC-22](#ac-22), [AC-23](#ac-23), [AT-2(1)](#at-2.1), [AT-2(2)](#at-2.2), [AT-3(1)](#at-3.1), [AT-3(2)](#at-3.2), [AT-3(3)](#at-3.3), [AT-4](#at-4), [AU-3](#au-3), [AU-6(1)](#au-6.1), [AU-6(3)](#au-6.3), [AU-6(5)](#au-6.5), [AU-6(6)](#au-6.6), [AU-6(9)](#au-6.9), [AU-7(1)](#au-7.1), [AU-7(2)](#au-7.2), [AU-11](#au-11), [AU-13](#au-13), [AU-16](#au-16), [CA-2(1)](#ca-2.1), [CA-2(2)](#ca-2.2), [CA-2(3)](#ca-2.3), [CA-3(1)](#ca-3.1), [CA-3(2)](#ca-3.2), [CA-3(3)](#ca-3.3), [CA-7(1)](#ca-7.1), [CA-9](#ca-9), [CM-2(2)](#cm-2.2), [CM-3(1)](#cm-3.1), [CM-3(4)](#cm-3.4), [CM-4](#cm-4), [CM-6](#cm-6), [CM-6(1)](#cm-6.1), [CM-7(2)](#cm-7.2), [CM-7(4)](#cm-7.4), [CM-7(5)](#cm-7.5), [CM-8(all)](#cm-8), [CM-9(1)](#cm-9.1), [CM-10](#cm-10), [CM-11](#cm-11), [CP-7(all)](#cp-7), [CP-8(all)](#cp-8), [SC-43](#sc-43), [SI-2](#si-2), [SI-3](#si-3), [SI-4(all)](#si-4), [SI-7](#si-7), [SI-8](#si-8).

GovRAMP crosswalk

Not selected in the imported Snapshot or Core sets. This does not establish exclusion from other GovRAMP baselines.